The City of Farmington has issued a driveway notices to residents on Saxony Street. The contractor will tentatively begin working on the removal and replacement of concrete curb & gutter and roadway on Monday, August 17th (weather dependent). The notice is to inform residents that within the next 24 hours they will lose access to driveway approaches. Please be aware that once concrete is placed it will take 7-10 days before the concrete meets the required strength. Once strength is achieved the contractor will remove the barricades.
Those with special needs, should contact any of the numbers below to make arrangements.
Please keep children and pets away from the construction operation. Construction
activities, and the associated equipment that goes with it, is attractive to small children and can be dangerous. Please keep children away from the equipment, removals, mass grading, underground utility installation, and wet concrete.
If you have any specific questions regarding the road construction, such as scheduling, parking or access, please call
Mr. Mike McNutt, Construction Inspection for OHM at (313) 516-4735, Ms. Jessica Howard, Project Engineer for OHM, at (248) 751-3114, or the Contractor, Hartwell Cement Co., Mr. Ward Houldsworth (248) 789-4156.
Updated information will be handed out and attached to residents' front door as necessary.
********
In preparation of the project, we asked that residents with irrigation systems to please clearly identify and mark any sprinkler heads and other irrigation-related devices.
On-street parking will be prohibited in the areas the contractor is working, and any parked vehicles will need to be removed.